|
The Mildura railway line is a railway line in Victoria, Australia. It runs from Ballarat in an approximate north-norwesterly direction to Mildura. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903. It has nine main stations. Passenger services ceased on the line in 1993, but freight services continued to be operated on the line by Pacific National. An announcement was made in 2006 for passenger services to be re-introduced to Mildura after a 13-year absence, under the Linking Victoria program. Passenger services were reintroduced from Ballarat to Maryborough in July 2010. ==History== The Mildura line was opened from Ballarat to Creswick, Clunes, Maryborough and Dunolly in 1874 and 1875, and extended to St Arnaud in 1878, Donald in 1882, Birchip in 1893, Woomelang in 1899, Ouyen, Red Cliffs and Mildura in 1903, Merbein in 1910 and Yelta in 1925. A line was opened from Ballarat to Waubra in the 1880s. It closed in the 1960s. A branch line was built from North Creswick to Daylesford in 1887, connecting with the line from Carlsruhe. It had stations at Broomfield, Allendale, Newlyn, Rocklyn, Wombat, Leonard, Sailor's Falls and Woodburn. This line closed in 1953. A line was opened from Maryborough to connect with the Melbourne–Bendigo line at Castlemaine in 1874. This line is not currently used by regular traffic. Another branch line was opened from Maryborough to Avoca in 1876 and Ben Nevis and Ararat in 1890. This line was closed in 1959, reopened in 1966, standardised in 1996 and closed again in 2005. The Navarre line opened from Ben Nevis to Navarre in 1914 and it was closed in 1954. A line was opened from Dunolly to Inglewood in 1888, connecting with the Bendigo–Boort line, completed in 1883. The Pinnaroo line (Victoria) opened from Ouyen to Murrayville in 1912 and the South Australian border in 1915, connecting with the Pinnaroo line (South Australia) to Pinnaroo and Tailem Bend. The Genesee & Wyoming Australia line west of Pinnaroo was standardised in 1998 creating a break-of-gauge. Nevertheless, it is proposed to standardise the line from Geelong to Mildura and the line between Ouyen and Pinnaroo. In 2006, state and federal money was announced to upgrade the line to Mildura with gauge convertible sleepers. However, this upgrade will still leave the passenger service in limbo. The Morkalla line was completed from Red Cliffs to Meringur in the 1920s and extended to Morkalla in the 1930s. This line closed in the 1980s. A 2 km section of the line near Red Cliffs has been converted to a 610 mm-gauge steam railway, operated occasionally by the Red Cliffs Historical Steam Railway (see (Victorian Tourism )). In 1923, a series of sidings were placed between the Mildura station and the wharves on the Murray River. These included a zig-zag section to enable trains to travel between the different elevations. These sidings were removed in 1973.〔"Mildura's Riverfront Railways" ''Australian Railway Historical Society Bulletin'' February 1978 pages 33–38〕 A passenger service was provided by V/Line with three weekly overnight services from Melbourne (known as the ''Vinelander''), including sleeping cars, until 1993 when it was discontinued by the Kennett Government.〔(【引用サイトリンク】title=The Mildura Story The Battle of the Routes )〕 The former Bracks/Brumby Governments promised to re-open this line to passenger traffic as part of its pledges for the 1999, 2002, 2006 elections. They also pledged the reopening of Clunes station in the 2010 election. In December 2007 work began on upgrading the line between Gheringhap (on the Geelong–Ballarat line and Mildura, at a cost of $73 million and involving one in every two sleepers being replaced, and lifting maximum train speeds to 80 km/h.〔(【引用サイトリンク】title=WORKS BEGIN ON MILDURA RAIL FREIGHT UPGRADE )〕 Current speeds are restricted to 50 km/h on one-third of the track and are as low as 30 km/h in some sections.〔(【引用サイトリンク】title=Roads, ports and freight - Mildura Rail Freight Upgrade - Frequently asked questions )〕 In April 2008 it was announced that the Mildura–Yelta section of the line would also be upgraded, as part of the Victorian core grain network in a $23.7 million package with 6 other lines.〔(【引用サイトリンク】title=$43m to upgrade rail freight lines )〕 As part of the upgrades for the return of Maryborough passenger services, the crossing loops at Sulky, Tourello and Talbot stations have been removed, resulting in only one train at a time being able to use the 60 kilometres of line between Ballarat and Maryborough.〔V/Line Weekly Notice: "NORTH BALLARAT - MARYBOROUGH. TOURELLO LOOP ABOLISHED LEVEL CROSSING UPGRADES"〕 The loop at Sulky was removed on 12 February, the loop at Talbot on 24 February.〔"Signalling and Infrastructure" ''Railway Digest'' May 2010 page 56〕 In October 2010, the Victorian government released a report into public transport improvement options for the north-west of Victoria, outlining nine proposals for public transport projects. Options discussed include the return of passenger trains on the existing line, or via an extension of the Yungera line to connect to the Mildura line at Ouyen.〔(Victorian Government press release—"NORTH WEST PUBLIC TRANSPORT REVIEW REPORT RELEASED", 13 October 2010 )〕〔(North West Public Transport Review )〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Mildura railway line」の詳細全文を読む スポンサード リンク
|